Burlcore Mining Co.
Newsroom · Busia, Uganda

Environmental rehabilitation in Uganda's Green Belt.

Burlcore Mining operates to a structured environmental rehabilitation standard across its licensed concession in Busia, within the Lake Victoria Green Belt.

22 June 2026 Busia, UgandaBurlcore Newsroom

Burlcore Mining advances environmental rehabilitation in Uganda.

Burlcore Mining Company Limited continues to advance the environmental standards expected of a modern, medium-scale gold operator in East Africa, with rehabilitation, monitoring and stewardship treated as core operational disciplines.

Operating inside the Lake Victoria Green Belt brings real responsibility. Burlcore's approach is to plan rehabilitation alongside extraction from the outset, not as an afterthought once a pit is closed, with ongoing environmental monitoring across the licensed area.

The company works within the framework set by Uganda's Directorate of Geological Survey and Mines (DGSM), supported by its permanent on-site management team. Documented procedures, formal contracts and accountable oversight underpin daily operations.

This approach is deliberately different from less formal practices that have persisted across parts of the region's artisanal sector, and is part of what Burlcore believes responsible mid-tier mining in Uganda should look like.

Rehabilitation planning at Burlcore begins at the pit-design stage. Topsoil is stripped, stockpiled and preserved separately from overburden so it can be redeployed during reprofiling; drainage is engineered to avoid sediment loading of nearby watercourses; and progressive rehabilitation is scheduled into the mine plan rather than deferred to a distant closure date.

Water quality at nearby sources is periodically sampled, and vegetation cover on rehabilitated ground is re-established with indigenous species suited to the Lake Victoria basin, prioritising biodiversity value over cosmetic greening.

The sequencing matters more than the total spend. Because stripped topsoil loses its seed bank and microbial life within a season or two of sitting in an exposed heap, stockpiles are kept shallow, vegetated and separated from waste rock so the material returned to a reprofiled pit is still living soil rather than sterile fill.

Sediment control is the second discipline. In a catchment that drains toward Lake Victoria, the realistic environmental risk from a medium-scale operation is not a dramatic spill but the slow, cumulative loading of silt into seasonal watercourses. Cut-off drains, settlement traps and hardened crossings are treated as production infrastructure, inspected on the same cycle as plant and equipment.

"Rehabilitation isn't something we leave until the end. It's planned, monitored and resourced from day one."
- A Burlcore Spokesperson
Landscape near the Burlcore concession in Busia, Uganda
Community area within the Lake Victoria Green Belt

Burlcore continues to refine its environmental standards as the operation matures, with a clear emphasis on long-horizon stewardship of the land it works on.

Rehabilitated ground is also assessed for what happens after handover. Where reprofiled land can return to smallholder cultivation or grazing, that end use is agreed with local leadership before the work is done, so restoration produces something the community can actually use rather than a fenced-off area of planted cover.

The company sees responsible environmental practice not as a constraint, but as the foundation of a durable mining business.

The company reports environmental performance through the standard DGSM reporting channels, holds a NEMA-approved Environmental and Social Impact Assessment for the concession, and welcomes independent inspection as part of normal operating rhythm.

ENDS

Green Belt
Operating within the Lake Victoria Green Belt with full environmental oversight.
Rehabilitation
Site rehabilitation planned alongside extraction from day one.
DGSM Framework
Working within Uganda's formal environmental and licensing framework.
Media Contact
Burlcore Mining Company Limited, Press Office
Elias Cheikh
elias@burlcore.com
Peninsula Road, Luzira, Central Nakawa, Kampala, Uganda · burlcoremining.com
Our pledge

Rooted in Busia,
refined for the world.

Every ounce we recover is the product of disciplined work, formal compliance, and deep respect for the land and the communities that make it possible.

I.Responsibly mined
II.Formally compliant
III.Community first
IV.Built to last