Burlcore Mining Co.
Operations · Busia

Flagship mechanised gold mining at the Busia concession.

Burlcore Mining's flagship medium-scale concession sits within the Lake Victoria Green Belt in Busia, Eastern Uganda - a proven, high-yield auriferous geology operated with disciplined asset management.

SEC.01 / Overview

Flagship Mechanised Mining at the Busia Concession

High-Yield Gold Production Grounded in Geological Discipline

Burlcore Mining operates a premier, medium-scale gold mining concession in the Busia District of Eastern Uganda. Situated squarely within the Lake Victoria Green Belt - one of Africa's most prolific and proven precious-metals geologies - our operations stand out through disciplined asset management and mechanised infrastructure.

Unlike surrounding artisanal setups, Burlcore leverages year-round dry-season operational capabilities, robust grid-plus-diesel power redundancy, and continuous concession expansion to extract and recover high-purity gold safely and predictably.

Every process is documented and repeatable. From geological mapping and controlled drilling through to gravity concentration and formal doré handover, the operation is built to institutional standards from day one.

SEC.02 / Operating highlights

What this looks like in practice.

Mechanised extraction

Purpose-selected earth-moving fleet and gravity recovery circuits designed for medium-scale throughput.

Year-round capacity

Dry-season operational planning and drainage design keep production running through Uganda's climate cycles.

Power redundancy

Grid supply reinforced by on-site diesel generation to eliminate unplanned downtime.

Geological discipline

Controlled mapping, sampling and grade control before every phase of expansion.

Concession expansion

Structured programme of adjacent licence work within the wider Green Belt corridor.

Safe, predictable output

Documented SOPs from pit face to formal handover, audited internally on a rolling basis.

SEC.03 / Concession timeline

Geological & operational milestones.

  1. 2023
    Concession secured

    Licensing and site assembly across the Busia concession within the Lake Victoria Green Belt.

  2. 2024
    Site build-out

    Access roads, workshop, security perimeter and initial mechanised fleet mobilised on site.

  3. 2025
    Full production ramp

    Continuous extraction with grid-plus-diesel redundancy and formal chain-of-custody controls in place.

  4. 2026
    Expansion phase

    Ongoing exploration and adjacent licence programme to extend the mine life within the concession.

SEC.04 / Chain-of-custody
Verified chain-of-custody

Every ounce recovered by Burlcore Mining is documented from pit to point of sale. Our chain-of-custody protocols are aligned with OECD Due Diligence Guidance and LBMA responsible-sourcing standards, with continuous DGSM oversight and auditable handling logs at each transfer point.

DGSM licensed
OECD aligned
LBMA standards
SEC.05 / Corporate inquiries
Institutional stakeholder? Get in touch.

For regulator liaison, refinery counterparty, investor or compliance-audit enquiries, contact our press & investor office directly. All correspondence is logged and routed to the appropriate operational lead.

Our pledge

Rooted in Busia,
refined for the world.

Every ounce we recover is the product of disciplined work, formal compliance, and deep respect for the land and the communities that make it possible.

I.Responsibly mined
II.Formally compliant
III.Community first
IV.Built to last